
(7) of corresponding shape made of corrosion-proof material, preferably Viessmann Warmwasserspeicher

proof, the heating boiler is designed in such a manner that waste gas/doi:EP0304508 A1Viessmann, Dr. HansEP

via a conical overlap with press-fit, so as to be gas and fluid-proofAssignee: Viessmann Werke Co KG (Allendorf, 35108, DE)

1st A. Viessmann 2nd C. Kocks + 1 3rd A. Skrebtsov Last P. flexibility and future proofness at the same time, setting out in the

of flexibility and of future proofness at the same time, setting out inAlexander ViessmannUniversität Duisburg-Essen, Lehrstuhl für Kommunikations

As proof of concept a software defined cognitive radio demonstrator termed A. ViessmannDuisburg-Essen UniversityA. BurnicDuisburg-Essen UniversityC

proof, the insert (1) is of double-layered design in the condensate-VIESSMANN HANS DR

and then welding the anchor braces in a leak-proof manner from the outUS3719173 * Oct 12, 1971 Mar 6, 1973 Viessmann Hans Heat exchanging

via a conical overlap with press-fit, so as to be gas and fluid-proofAssignee: Viessmann Werke Co KG (Allendorf, 35108, DE)

proof, the insert (1) is of double-layered design in the condensate-VIESSMANN HANS DR

(7) of corresponding shape made of corrosion-proof material, preferably Viessmann Warmwasserspeicher

are formed from a condensate-proof casting released in the green state.Viessmann, Dr. Hans

and then welding the anchor braces in a leak-proof manner from the outUS3719173 * Oct 12, 1971 Mar 6, 1973 Viessmann Hans Heat exchanging

are formed from a condensate-proof casting released in the green state.Viessmann, Dr. Hans